Our services focus on the main parts of a property's onsite wastewater system, from planning new installations to evaluating and addressing existing problems. Each project begins with the conditions and requirements of the individual site.
Plan a new septic system around your property's soil, wastewater needs, and applicable county requirements.
Learn more →Explore replacement options for aging, damaged, or failing septic systems on eligible properties.
Learn more →Investigate septic problems and identify appropriate repairs before assuming full replacement is necessary.
Learn more →Plan replacement of failing septic soil treatment areas based on site conditions and approved designs.
Learn more →Understand existing septic conditions before buying, renovating, repairing, or replacing a system.
Learn more →Start with installation if you are building a new home or planning wastewater service for vacant land. Check sewer eligibility and gather a proposed bedroom count and any site drawings. For a home with an existing system, look for the permit and sketch of the system before discussing an upgrade, repair or replacement.
Replacement may be the right subject for an inquiry if an evaluation points to the end of the system's usable life or a planned addition changes the design needs. For repair, describe when symptoms started, whether they affect a single fixture or several, and what work was done recently. For a drain field evaluation, bring the existing layout, known well locations and notes about recent grading, traffic or landscaping changes near the field.
An existing-system inspection is useful if you are buying a property or need to understand the current condition before planning work. Ask whether the inspection includes a written report and what access the provider will need. This is separate from the county's inspections tied to a construction permit.
Have the property's ZIP, an outline of the job, any system drawings and the proposed construction timeline. If you have received recommendations or estimates, bring the scope of those estimates. Ask which items are included, including design, permit fees, excavation, equipment, disposal and final grading. For a permitted installation, identify who will coordinate the county inspection and what will stay exposed until it takes place.
Properties in the same town can have different access, setback and utility constraints. Mention a narrow driveway, gate, nearby well or recorded easement if known. These details help someone reviewing the project decide what to evaluate during the site visit and where a written estimate needs allowances for site-specific work.